Back to School: What’s new on the True Blue Campus
Welcome back! For many students, this is either their first time on St. George’s University’s iconic True Blue campus or their first time being back in Grenada since the beginning of the COVID-19 pandemic. Here is a rundown of the new and exciting places they get to explore upon their return.
“There is nothing like experiencing a vibrant St. George’s University campus with all our students, faculty, and staff back together,” said Dr. Glen Jacobs, provost at SGU. “We’re excited to share these improvements with our campus community. This term, our students on the True Blue campus will have full access to the facilities that make SGU such an outstanding place to receive a world-class education.”
Over the past 22 months, several expansion and redevelopment projects have been completed at SGU in preparation for the return of its growing campus community. This includes the opening of the Eric Gairy Pavilion, where up to 282 students can convene for outdoor study, and the Beachfront Pavilion, which has a capacity for 324 students to conduct group study. Students on campus now have 52 percent more individual study spaces to choose from, following renovations with new carrels in Founders Library, Lower Modica Hall, Lower Taylor Hall, St. David’s Hall, St. Andrew’s Hall, and St. John’s Hall. SGU also recently updated its existing 56 clinical skills rooms with the newest technology—adding another 28 rooms and a new control center.
The goal of all these expansion and redevelopment efforts is to enhance campus life and the student experience. Additional enhancements students, faculty, and staff will be able to enjoy on campus starting this term include:
- New SVM Faculty Building: The latest SVM building features 34 brand new offices, a conference room, a reception area, and a small kitchenette. It was completed earlier this month and faculty have already started moving into their new digs.
- Marion Hall Renovation: The project included a massive expansion and upgrade of all research spaces. A highlight of the project is the student lab, which has now more than doubled in size and was completely renovated to include new furniture, fixtures, and a state-of-the-art AV system. Scheduled to be completed by August 2022.
- SimLab Renovation: Not just a renovation but also a relocation—the SOM SimLab has moved from Westerhall to the 2nd floor of St. George’s Hall. For this renovation, 22 hospital simulation rooms were constructed, each featuring an administrator room, state-of-the-art training equipment, and fully outfitted with new furniture and fixtures as well as training mannequins. The entire floor will have a new AV system, touch-screen InFocus monitor, and a dedicated control room on the same floor for the lead administrator to monitor all rooms simultaneously. Scheduled to be completed by September 2022.
- Happy’s Café: Located on lower campus, opposite of the Maintenance Department, the new café is poised to become the campus’ newest ‘instagrammable’ hot spot. Scheduled to be completed in early September 2022.
Since its inception 45 years ago, the University has erected more than 65 beautifully designed, functional buildings along the True Blue peninsula under the guidance of visionary architect Andrew Belford, SGU’s first director of admissions. Drawing inspiration from this past work, SGU continues to enhance its picturesque campus filled with striking neo-Cape Colonial buildings—with many contemporary advancements, making it an ideal place to learn and live.
“We can’t wait for the SGU community to experience the enhancements we’ve made to an already stunning campus,” said Christina Verderosa, SGU’s director of operations. “These various expansions and renovations will no doubt contribute to students’ academic success as well as an amazing campus experience for all.”
– Ray-Donna Peters